How to Integrate Jira with a Capacity Planning Tool: Complete Guide 2026
Learn how to integrate Jira Tempo with a capacity planning tool to automatically synchronize timesheet data. Step-by-step guide with examples.
Workload Team
Capacity planning experts for IT Directors with over 10 years of experience
Introduction: Why Integrate Jira?
Integrating Jira with a capacity planning tool enables you to:
- ✅ Automatically synchronize timesheet data
- ✅ Avoid time-consuming manual entry
- ✅ Compare forecasts vs actual times
- ✅ Improve forecast accuracy
- ✅ Centralize all data
Integration Benefits
- Time savings: 5-10 hours saved per week on data entry
- Accuracy: Data always up to date and synchronized
- Automation: No more manual entry needed
- Visibility: Forecast vs actual comparison in real-time
How to Integrate Jira Tempo with Workload
Step 1: Configure Jira Tempo
Ensure Jira Tempo is installed and configured in your Jira instance.
📥 Download the Complete Guide
Get our comprehensive 20-page guide on capacity planning for IT Directors. Includes best practices, templates, and case studies.
Step 2: Create an API Key in Jira
Create an API key in Jira with necessary permissions to read Tempo data.
Step 3: Configure Integration in Workload
In Workload, go to Settings > Integrations > Jira Tempo and enter:
- Your Jira instance URL
- API Key
- Projects to synchronize
Step 4: Map Users
Map Jira users with your team members in Workload to synchronize correct data.
Step 5: Enable Synchronization
Enable automatic synchronization. Data will be synchronized daily (or in real-time depending on configuration).
Integration Features
- Automatic synchronization: Actual times are synchronized daily
- Forecast vs actual comparison: Visualize gaps between forecasts and actual times
- Gap detection: Receive alerts in case of significant gaps
- Forecast improvement: Use historical data to improve future forecasts
Best Practices
- Synchronize daily for up-to-date data
- Regularly check user mapping
- Analyze forecast vs actual gaps to improve
- Train your teams to use Jira Tempo correctly
FAQ
Is synchronization real-time?
By default, synchronization is daily. You can configure more frequent synchronization if needed.
What happens if a user is not mapped?
That user's data will not be synchronized. Ensure all users are mapped.
Can I synchronize only certain projects?
Yes, you can choose which Jira projects to synchronize in the integration configuration.
Conclusion
Integrating Jira with a capacity planning tool enables automatic data synchronization and improved forecast accuracy.
Ready to integrate Jira? Try Workload free for 14 days.
Articles connexes
Capacity Planning DSI 2026 : Guide Complet, Tendances et Meilleures Pratiques
Guide exhaustif du capacity planning DSI en 2026. Découvrez les tendances, innovations, méthodes modernes et meilleures pratiques pour optimiser votre gestion de capacité IT cette année.
10 Erreurs à Éviter en Capacity Planning IT : Guide Complet pour DSI
Découvrez les 10 erreurs les plus courantes en capacity planning IT et comment les éviter. Guide pratique avec solutions concrètes pour optimiser votre gestion de capacité.